The Model Railway Club

The Model Railway Club

Members log in here

The Model Railway Club Blog

There's always lots happening at the Model Railway Club. Keep up to date by following our Blog. If you would be interested to edit a blog and you are an MRC member please contact the webmaster.

Electrical surgery for Copenhagen Fields

Posted by on in Copenhagen Fields
  • Font size: Larger Smaller
  • Hits: 164
  • 0 Comments
  • Subscribe to this entry
  • Print

Whilst there was a wedding and some footy on TV, our crack crew of electricians were at Keen House, continuing the rewiring of the layout.

 

The lines are now all working correctly and the new loop on the Down Main is live and running (track will need a bit of fettling). The end of the day should see the Up Main loop connected at the back, but the front Gasworks Board track will need droppers and of course the point motor installed.   Our electrical challenges are being resolved quicker than I feared, so we’ll soon be able to concentrate on the “nice” interesting stuff.

 

Our next booked session is the 8-10th June, please let us know if you are joining us. Then our next exhibition continues a recent Club theme of exhibiting surrounded by the prototype at the LT Museum in Acton on 7/8th July

Professor Tim Watson is President of the Model Railway Club and project leader of the MRC's Copenhagen Fields layout.

Comments

  • No comments made yet. Be the first to submit a comment

Leave your comment

Guest
Guest Friday, 22 June 2018