Posted by on in Copenhagen Fields
Point Rodding

We have been doing quite a bit of work behind the scenes in the last few weeks to make CF easier to shift and exhibit - especially as we have Ally Pally coming up in less than a fortnight.  We have a truly massive fiddle yard board at the back that has undergone a weight & width reduction programme.  It is now 10kg lighter and a bit narrower.   Our bespoke barrier is now screwed together, making it much more robust and unlikely to fall apart in transit. And silly things like a lifting hook and lifting bar are now properly located in storage pockets in the box they relate to. All of these minor changes can save valuable minutes when erecting and dismantling the layout.

Posted by on in Copenhagen Fields
First stop - Stevenage

Over the Christmas period we've been doing some unglamorous logistics work - tidying up the electrics and rearranging the transport boxes to make travelling to and from shows easier - ready for our 2017 outings, the first of which is at the CMRA's first show at Stevenage Arts and Leisure Centre on 14th and 15th January.   

In the meantime, Doncaster works has, I hope, finally adjusted the new chassis in 'Papyrus' so that it will run successfully on CF at Stevenage. The main problem which presented at Warley was that the 13 mm fine scale drivers are 0.8 mm smaller than the N scale originals, which threw out the front bogie clearances. With a bit of luck she will turn out to be a really useful green engine and look good on the Queen of Scots Pullman.

b2ap3_thumbnail_Papyrus.jpg

With this project out of the way work has resumed on the P2, 'Lord President' and the valve gear is now erected on the LHS.

b2ap3_thumbnail_Lord-President-valve-gear.jpg

The valve gear can be placed in forward or reverse, as can be seen in this video: https://youtu.be/fUTQ5Ibe1Bk

Posted by on in Copenhagen Fields
Highlights from Warley

 

So we're back from Warley. Setting up was restricted to four hours because of a delay getting into the hall - we need five, to include getting stock on.  Needless to say, our running on Saturday morning was a bit of a trial.  However the big success was seeing the major works at the south end giving the layout a big improvement in its overall ambience.

  

Posted by on in Copenhagen Fields
Goods and Mineral Junction Box

 I thought you might like to see the last bit of work on the centrepiece of Belle Isle, before we crated the layout to go to Warley.

 b2ap3_thumbnail_CF-Nov-16-E.JPG

Making blocks of buildings is a useful way of checking shape / space requirements. There is no question that Goods & Mineral Jcn. box will need a fully detailed interior, because you will be able to see see right into it from the front.  We should also have all the lattice girder work in time for Warley, assuming Mike's eyesight holds up.

 b2ap3_thumbnail_CF-Nov-16-D.JPG

Finally, whilst ruffling through Matthew's Brown Box I found the last of Ced Verdon's resin cast buses. These are exquisite works of art and, even if it is completely the wrong type of bus, looks excellent on York Way. Just needs a few bill boards along the parapets to complete the scene.

b2ap3_thumbnail_CF-Nov-16-F.JPG

 Tim

 

Posted by on in Copenhagen Fields
Professionalism Maintained

The layout running settled in very nicely at the Club's Open Day on 20th November.   Gary has devised a very elegant shuttle mechanism for the underground and Richard's buildings made major progress as he demonstrated today.

b2ap3_thumbnail_CF-Nov16-A.JPG

The main buildings and roads have been given a more convincing colour wash at the south end (which belies the large amount of work still required) and Mike's eye aching lattice bridges are beginning to look the business on the ramp line.  The goods warehouse will be lowered to single story for three bays near York Road after the next show - it would be more in keeping with the potato warehouses at this site and make the building 'stack up' better

 b2ap3_thumbnail_CF-Nov-16-B.JPG

The new J39 has bedded in well and the repaired B17 purred along all day.  The A3, Papyrus, despite a frustrating amount of tweaking, still has a wooden leg and so the chassis will probably be replaced by a 12 hr fine scale replacement - perhaps even in time for Warley.

 

We have maintained professionalism in the Club on York Way as can be seen by one of the photos: probably a senior member of the legal profession in the Jaguar.

b2ap3_thumbnail_CF-Nov-16-C.JPG

Posted by on in Copenhagen Fields
Work "Ramps Up"on Goods Yard

Quite a lot of recent progress in the King’s Cross yard. The ramp to the Cally Goods & Coal Yard is now blocked out and in red oxide primer.  It is red brick anyway, but will need detail cladding in our home made brick plastic. In the short-term it will be weathered in its current form to meld it into the scene.

 b2ap3_thumbnail_image1.JPG