Ingatestone: June Update

A slightly delayed update this month as we handed over blogging responsibilities to a new member of the OO group - me!

 

A lot of progress has been made on Ingatestone in the last few weeks.  This is greatly helped by the fact that all 6 scenic boards are now up full time in the lower hall.  We expect to working on them all through the summer so do come down and see progress for yourself.

 

One of the goals of Ingatestone was to have as long as possible stretch of mainline to allow us to run some prototypical length trains.  As you can see from these pictures, the length looks quite impressive now we have the full set of boards up running.

 

b2ap3_thumbnail_FullLength.jpgb2ap3_thumbnail_FullLength2.jpg

 

Posted by on in Ingatestone
Ingatestone's back from its holidays

The summer is often a down time for modellers, as family holidays, the gardening and BBQ's take over. But we have been continuing with work on Ingatestone b2ap3_thumbnail_20160905_205804.jpgmostly on Board 6 (the big corner board that goes into the fiddle yard) with what in the photo looks like a complicated amount of wire and points is in fact a simplification. The expanded fiddle yard being built by Putnum has head shunts so we have now dispensed with ours we just need to return our trains to the (correct?) UK running practice. Hence James, Chris and Lawrence have re-laid the track and put in points and motors in tandem. So with one flick of the switch both move which means a lower risk of accidents as the ladder is either open or closed. As pictured the wires and electrics are in Beta testing ahead of proper installation.

Tagged in: 4mm Ingatestone layout

Posted by on in Ingatestone
It's a wrap !

In preparation for Ally Pally this coming weekend, the Ingatestone crew have been busy getting ready the boards that we are taking to display. On Sunday, the packing crates for the corner boards were finished, with an extra day of work by Tom, Bob and myself getting the foam core for the scenery being cut. What is on display will be a work in progress to show visitors how we are building the scenery, to allow them to ask questions, learn and hopefully come and visit us at our open day in May. To act as a "place marker" for the PECO

Posted by on in Ingatestone
Ingatestone powers ahead !

This weekend saw Lawrence. Mo and Tom make progress with the power wiring for the layout, as well as on the woodworking. Protector boards to avoid track damage on board ends are being fabricated, and the covers for the trolleys that will be home to the corner boards 5 and 6 took more steps forward. See the pictures of Lawrence making connections on Boards 3 and 4 above and below. We welcome anyone who would like to joing us - all skill levels are most welcome!

b2ap3_thumbnail_IMG-20160207-WA0003.jpg

Empire Mills - Getting ready for Portsmouth

I haven't posted for a while - this doesn't mean we haven't been doing anything we have - well I haven't but the team has. However, with an exhibition looming we have had a burst of activity that quite frankly puts our gentle summer progress to shame.

The show - its all about the show after all - is the South Hants MRC's exhibition in Portsmouth on 21 November 2015

Posted by on in News
Ingatestone Away Day !

On Saturday June 27th, the Ingatestone team will be heading to Ingatestone (where else!) for a measuring, drawing and photographing session. From the station area to the Cricket Pavilion, we'll be busy getting the detail as accurate as possible for our layout. If you are in the area from mid-morning onward, come by and see us!

Posted by on in Ingatestone
Welcome to the Ingatestone Blog!

This is the first blog by the team that will be bringing Ingatestone to life in 4mm scale. The team are: Chris Ibbotson, Tom Slade, Bob Allaway, Maurice (Mo) Beanlands, Lawrence Robbins and Kavind Patel. We are at Keen House most Thursday nights from 19:00 and also have Sunday working sessions from 11:00 that will be advertised on here.

We welcome new members irrespective of their skill level - we all have to start somewhere. Drop us an email at: This email address is being protected from spambots. You need JavaScript enabled to view it. to contact us!


Posted by on in Empire Mills
Empire Mills post Ally Pally 2015

Yesterday we had our first official layout group meeting. Probably should have done it sooner, but better late than never. In this we discussed follow up from Ally Pally, things that went well and things that didn't. We also covered what needs to be done before our next outing (Portsmouth in November) and who is to do what. Up until now the layout has gone in the back of a 7.5T truck with other stuff/layouts for AP, but this has to change. We had originally intended to have the layout fit in the back of an estate car, and now I have six months to figure out how to do it. This will possibly include some modifications to how the layout goes together so that it can be set up more easily and by fewer people.

Duncan produced a comprehensive list of all the tasks that need doing and they have mostly been allocated. They range from simple things such as "This building needs a bit more detail around the base" to middling difficulty "We need a box for the large clay dry to transport and store it safely" to the complex "How on Earth do we fit all of this into the back of a car?"

After the current option had been "finished" we moved on to discussing what we wanted to do next. The layout is designed so that

Tagged in: EM gauge layout