Copenhagen Fields Update March 2019

We had a good show at Basingstoke, although our sanity was sorely tried by a closeby O gauge diesel depot with loud DCC sound that closely mimicked purgatory. Our re-wire was 100% successful, so that’ll be good for another 35 years: this is entirely down to the hard work and clear thinking of Rob Stewart. …read more.

Mar 17, 2019

Putnam Yard Update March 2019

Recent work from the Putnam Group Main effort has been on preparing for Ally Pally by getting the existing layout ready; including ironing out some remaining track and wiring issues, redoing some damaged scenery along the front, some fettling of the backscene and numerous other little jobs. The work on the remaining hitherto unsceniced curved …read more.

Mar 17, 2019

Sliding Doors – Red or Blue?

  Class 321 Electrical Multiple Units (nick named Dusty bins)  are the work horse unit on the Great Eastern main line through Ingatestone on the Essex and Suffolk commuter trains. They come in 4 car formations, but run in multiple to cope with the peak hour demand, so we need a number of them. Although …read more.

Feb 25, 2019

Ingatestone is ready for action

As you can see from the pictures Ingatestone is back up in full, including the fiddle yard,  for the last part of the year in the lower hall.  In January 2019  we will swap out  the scenic side of Ingatestone for the scenic side of  Putnum Yard – both layouts share the same fiddle yard …read more.

Aug 21, 2018

An update from Ingatestone – Aug 2018

  Chris Ibbotson has been busy bringing a Hornby Class 90 up to a better standard. This model was fair representation when first released many years ago but suffered from many of the issues that are a result of Hornby’s wish to produce a product that was both a toy and a model.  But this has been over come by …read more.

Aug 4, 2018

Orchard Wharf July 2018 update

 In June Empire Mills was sold. Following its departure the space it occupied was cleared out and the baseboards for Orchard Wharf moved in. Thanks to the Lacey Dale team we now have a space for both groups to work in. NB look out for the writeup of Empire Mills in the August 2018 BRM …read more.

Jul 23, 2018

Orchard Wharf May/June 2018 update

In the last month we’ve had several good meetings, including a ‘kick-off’ to refresh everyone’s acquaintance with the project, two meetings focused on aspects of the design, a site visit to Poplar, Canning Town and Silvertown, and a much-needed clearout of the space we need to start work on tracklaying and electrics. I would like …read more.

Jun 10, 2018

Wagon repair shop on DVD

Back in February, we had a wagon demonstration next to Empire Mills at the Doncaster exhibition. During the show Phil Parker from BRM interviewed Ben W about the wagons he was fettling, and the result is on the DVD that comes with the June edition of the magazine.

May 26, 2018

Electrical surgery for Copenhagen Fields

Whilst there was a wedding and some footy on TV, our crack crew of electricians were at Keen House, continuing the rewiring of the layout.   The lines are now all working correctly and the new loop on the Down Main is live and running (track will need a bit of fettling). The end of the …read more.

May 20, 2018

Minories goes to Derby Roundhouse

On the 12th and 13th May, Minories headed north to the historic Derby Roundhouse – for the Michleover Model Railway Group exhibition. John, Rob S and Tom headed north on Friday in a transit van (which came with a special adaption to first gear to keep the driver awake), where we met up with former chairman …read more.

May 16, 2018

Get involved with Orchard Wharf!

First meeting Friday 18 May 2018, 18.30 in the Library The build of Orchard Wharf is now under way. We propose to meet regularly on Friday evenings (with a possible earlier start for those available in the afternoon). The first meeting is on Friday 18 May. All members are welcome to attend. We’ll provide another …read more.

Apr 30, 2018

Reflections on Ingatestone’s first show

In the months since our last update much has been done to the layout and the common fiddleyard shared with Putnam (H0) with the main goal of taking Ingatestone (00) to the London Festival of Railway Modelling in March 2018 at Ally Pally. We intended to show the full layout, under construction but with roundie-roundie …read more.