The Club builds and operates layouts in a variety of scales.
A new home test track
One of the great benefits of MRC membership is access to the test tracks, allowing us to run our models on a decent sized circuit to run them in, and identify any niggles. Many of us will also have a short section of track at home and if we’re lucky maybe a ‘rolling road’ to …read more.
Feb 25, 2023Minories Fiddle Yard Control Panel
Every layout needs a control panel – well all of mine do because I haven’t progressed from DC control as I find traditional DC control still works perfectly well and I’m not too bothered about lights and loco sound. The extension of the fiddle yard on Minories meant a new fiddle yard control panel …read more.
Jun 20, 2020Sarum Road – Part 5 – The Power Box
You can go back to the beginning of this series and see the previous instalments here: Part 1, Part 2, Part 3 This was going to have been an article on the traverser but it started getting difficult and so whilst cogitating on how to build the thing, I decided on building the power box. However, …read more.
Jun 11, 2020Sarum Road – Part 4 – Track Laying
You can go back to the beginning of this series and see the previous instalments here: Part 1, Part 2, Part 3 Each section of rail, irrespective of fishplates, etc, has its own wire droppers soldered to the underside of the rail to ensure electrical continuity. The rail sides were chemically darkened using gun blue before …read more.
Jun 4, 2020Exchange Sidings – A start in EM gauge
In Bulletin 416, I outlined the plans for a small shunting EM gauge layout that we would try to build in a weekend. So did we do it? The 21 and 22 February 2004 were the days chosen for the project. Despite a number of offers of assistance, I was slightly concerned on whether the …read more.
May 8, 2020Electrical surgery for Copenhagen Fields
Whilst there was a wedding and some footy on TV, our crack crew of electricians were at Keen House, continuing the rewiring of the layout. The lines are now all working correctly and the new loop on the Down Main is live and running (track will need a bit of fettling). The end of the …read more.
May 20, 2018Copenhagen Fields – November 2017
Space is always tight in our lower layouts hall, but we’ve got a few weeks available to have the whole layout up, which gives us the chance to carry out some of the more major projects on track and wiring. We have had an incredibly productive day today with both new fast line loops completed …read more.
Nov 24, 2017New control panel for Empire Mills, and two chances to see us
Here’s a preview of the new control panel. Wiring work to support this is now in hand with the two main boards done and the two subsidiary modules depicting the clay dries on course. Come and see us this weekend at the MRC open day — we are hoping to have the basics completed! We …read more.
Apr 4, 2017Empire Mills – Feb 17
We’ve had a couple of good operating evenings at Keen House already this year, and the picture above shows my Class 08 on shunting duty this week. Members will have read in our last Bulletin that Empire Mills has new trackwork and a colourful new turntable fiddleyard. Over the next month or two we will be …read more.
Feb 4, 2017